Depot Work Begins

2019-09-02T11:43:03+00:00

What’s been happening down at the depot? Since we signed the lease on the unit we’ve been working to get the building equipped. The floorspace isn’t huge, so we’re having a mezzanine installed in order to create some office space. And once that’s in, we’re going to need some office equipment. On the ground floor, a freezer room and cold room are being built by the lovely people at Chilleco, with some racking thrown in for good measure. A tip from Annette at the Morecambe Bay Foodbank alerted us to the possibility of getting some pallet racking from a [...]